cas·say

South Tenerife Airport

2021

Technical assistance for drafting the project, construction management and control and monitoring: Functional improvements of the Terminal building according to functional design at Tenerife South Airport. File DIN 407/16'.


35,692.30 m².


material execution budget: €59,941,026.34.

client: Aena S.A.

status: building opened 05-25-2022



Furniture and equipment processing building and replacement boarding counters Terminal T1 Aeropuerto de Tenerife-Sur.


PEM: €358,558.57

client: Aena S.A.



+ Aertec Solutions + Trazas Engineering.

back