South Tenerife Airport
2021
Technical assistance for drafting the project, construction management and control and monitoring: Functional improvements of the Terminal building according to functional design at Tenerife South Airport. File DIN 407/16'.
35,692.30 m².
material execution budget: €59,941,026.34.
client: Aena S.A.
status: building opened 05-25-2022
Furniture and equipment processing building and replacement boarding counters Terminal T1 Aeropuerto de Tenerife-Sur.
PEM: €358,558.57
client: Aena S.A.
+ Aertec Solutions + Trazas Engineering.