cas·say

Extension CAP Washing machines with system. industrialized

2022

Preliminary expansion project through industrialized construction of the Primary Health Center of Sant Andreu de Llavaneres.


664.30 m².


PEM: €1,284,730.77.

client: Catalan Institute of Health.

status: under construction.

back