Extension CAP Washing machines with system. industrialized
2022
Preliminary expansion project through industrialized construction of the Primary Health Center of Sant Andreu de Llavaneres.
664.30 m².
PEM: €1,284,730.77.
client: Catalan Institute of Health.
status: under construction.