cas·say

Remodeling of the Tenerife South Airport VIP Room

2019

Construction project VIP Room Remodeling, Tenerife–South Airport.


1,824.24 m².


PEM: €3,786,662.03.



Equipment and furniture VIP Room, Tenerife–South Airport.


PEM: €332,615.33.



+ Aertec Solutions + Trazas Ingeniería.

back